Tuesday 28 February 2017

QUANTITIES OF MATERIALS PER CUBIC METRE OF CONCRETE

QUANTITIES OF MATERIALS PER CUBIC METRE OF CONCRETE

Quantity of materials such as cement, sand, coarse aggregates and water required per cubic meter of concrete  and mortar varies with the mix design of the concrete and mortar respectively. Following table gives the estimated quantity of materials required per cubic meter of mortar and concrete for various nominal mixes.



NOMINAL MIX

WATER CEMENT RATIO

WATER PER 50KG BAG OF CEMENT

CEMENT

SAND (CUM)

CRUSHED STONES (CUM)

CEMENT

F.A.

C.A.

BY WEIGHT (KG)

BY NUMBER OF BAGS

1

1


0.25

12.5

1015

20.3

0.710


1

1.5

0.28

14

815

16.3

0.855


1

2


0.3

15

687

13.74

0.963


1

2.5


0.35

17.5

585

11.7

1.023

1

3


0.4

20

505

10.1

1.06


1

4


0.53

26.5

395

7.9

1.106


1

6


0.7

35

285

5.7

1.197


1

8


0.9

45

220

4.4

1.232


1

1

2

0.3

15

560

11.2

0.392

0.784

1

2

2

0.42

21

430

8.6

0.602

0.602

1

1.5

3

0.42

21

395

7.9

0.414

0.828

1

1.66

3.33

0.48

24

363

7.26

0.419

0.838

1

2

3

0.5

25

385

7.7

0.539

0.808

1

2

3.5

0.53

26.5

330

6.6

0.462

0.808

1

2

4

0.55

27.5

310

6.2

0.434

0.868

1

2.5

3.5

0.57

28.5

305

6.1

0.534

0.748

1

2.5

4

0.6

30

285

5.7

0.499

0.798

1

3

4

0.65

32.5

265

5.3

0.556

0.742

1

2.5

5

0.65

32.5

255

5.1

0.446

0.892

1

3

5

0.69

34.5

240

4.8

0.504

0.84

1

3

6

0.75

37.5

215

4.3

0.452

0.904

1

4

8

0.95

47.5

165

3.3

0.462

0.924

Notes:
1. F.A.= Fine Aggregates, C.A.= Coarse Aggregates
2. The table is based on assumption that the voids in sand and crushed stone are 40 and 45 percent respectively.
3. Air content of 1 percent has been assumed.
4. For gravel aggregates decrease cement by 5 percent, increase sand by 2 percent and coarse aggregate in proportion to fine aggregate in mix.
4. No allowance has been made in the table for bulking of sand and wastage.

No comments: